Abdel-Razek, R and McCaffer, R (1987) A change in the UK construction industry structure: implications for estimating. Construction Management and Economics, 5(03), 227-42.

Karni, R (1987) A systematic approach to stochastic scheduling. Construction Management and Economics, 5(03), 187-98.

Laufer, A and Tucker, R L (1987) Is construction project planning really doing its job? A critical examination of focus, role and process. Construction Management and Economics, 5(03), 243-66.

Peer, S (1987) Principles of an integrated construction company MIS with emphasis on its quantity-based sub-system. Construction Management and Economics, 5(03), 199-209.

  • Type: Journal Article
  • Keywords: contractor; cost control; information system
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446198700000020
  • Abstract:

    This paper outlines the basic concepts and principles in the development of an integrated construction company management information system (MIS) for controlling and steering the entire operation of the firm. The system is composed of three sub-systems. Incorporation of the time parameter in cost control unnecessary complicates the control procedure. This is dispensed with by separation between the functional modules for controlling past performance, and those processing future projections and trends, as demonstrated by a more detailed description of the quantity-based sub-system.

Wilson, O D, Sharpe, K and Kenley, R (1987) Estimates given and tenders received: a comparison. Construction Management and Economics, 5(03), 211-26.